首要条款 Paramount clause 精练油 Clean (petroleum ) products
清洁货舱 Clean the holds (to)
截至日 Closing date
封航 Closure of navigation
折叠式板架集装箱 Collapsible flattrack
全拆装 Completely knocked down (CKD)
强制引航 Compulsory pilotage
公会 Conference
拥挤 Congestion
拥挤费 Congestion surcharge
集装箱/滚装两用船 Con-ro ship
连续航程 Consecutive voyages
托运 Consign
收货人 Consignee
发货人 Consignor
托运;托运的货物 Consignment
拼箱 Consolidation (groupage)
联营 Consortium
常数 Constants
集装箱驳船 Container barge
集装箱租赁 Container leasing
集装箱化 Containerization
已装箱的,已集装箱化的 Containerised
集装箱船 Containership
货物污染 Contamination (of cargo )
分摊价值 Contributory value
传送带 Conveyor belt
集装箱(角件) Corner casting (fitting)
集装箱(角柱) Corner post
起重机 Crane
履带式(轨道式)起重机 Crawler mounted crane
港口惯例 Custom of the port (COP)
惯常协助 Customary assistance
日常营运成本 Daily running cost
亏舱费 Deadfreight
重量货 Deadweight (weight) cargo
载货量 Deadweight cargo (carrying)capacity
载重图表 Deaiweight scale
甲板货 Deck cargo
交货(交船) Delivery of cargo (a ship)
速遣费 Despatch or Despatch money
卸集装箱 Destuff
挪威船级社 Det Norske Veritas (D.N.V.)
绕航 Deviation
(车船)直卸 Direct discharge
直接转船 Direct transshipment
原油 Dirty(Black) (petroleum) products ( D.P.P.)
港口开支 Disbursements
卸货港 Discharging port
二船东 Disponent owner
船坞 Dock
码头工人 Docker
门到门运输 Door to door
(设备)故障时间 Downtime
吃水;水深 Draft (draught)
吃水限制 Draft limitation
引航员下船时 Dropping outward pilot (D.O.P.)
干货 Dry cargo
干货集装箱 Dry cargo(freight) container
干船坞 Dry dock
速遣费为滞期费的一半 Demurrage half despatch (D1/2D)
二级水手 Efficient deck hand (E.D.H.)
卸货机 Elevator
申请船舶进港(出港) Enter a ship inwards (outwards)
保税货 Entrepot
设备(常指集装箱) Equipment
设备使用费 Equipment handover charge
预计到达时间 Estimated time of arrival ( ETA)
预计完成时间 Estimated time of completion (ETC)
预计离港时间 Estimated time of departure (ETD)
预计准备就绪时间 Estimated time of readiness (ETR)
预计航行时间 Estimated time of sailing (ETS)
欧式托盘 Europallet
即使使用 Even if used (E.I.U.)
除外期间 Excepted period
异议 Exception